TRAINING CENTER

Important Notice Regarding the Application Process

Thank you for your interest in the Local 525 JATC Pipe Trades Apprenticeship Program. Please carefully review the following application timelines and requirements, as application deadlines vary by trade.


Plumbing & Pipefitting Applications

Application Period:
August 15, 2025 – March 15, 2026

Applications for Plumbing and Pipefitting will be accepted throughout the full application window listed above.

Program Start Date:
If accepted, apprentices will begin training in late August 2026.


❄ HVAC Applications — LIMITED AVAILABILITY

Due to very limited HVAC openings, HVAC applications will not follow the same application timeline as Plumbing and Pipefitting.

HVAC Application Deadline:

January 31, 2026 — 11:59 PM (Midnight)

  • No HVAC applications will be accepted after January 31, 2026.

  • Any HVAC application submitted after this deadline will not be considered, and applicants will be required to reapply during the next HVAC application cycle.

Next HVAC Application Window:

January 15, 2027 – March 15, 2027


Important Certification Deadline 

Please note that all applicants—regardless of when you submit your application—share the same final deadline to submit certifications or documents that count toward your application points.

Deadline to Submit Certifications: March 15

This means:

  • If you apply early (for example, in August), you may continue submitting eligible certifications until March 15.

  • If you apply later (for example, on March 13), you will still only have until March 15 — just two days later — to submit certifications.

  • No additional documents or certifications will be accepted after March 15.

Please ensure that all trade, safety, or technical certifications you wish to have considered for application point credit are uploaded or delivered by the final deadline.

Next Steps:

Once your application is submitted, you will be contacted with further instructions and timelines. If accepted, you will begin your apprenticeship program in late August 2026.

Thank you again for your interest in pursuing a rewarding career with Local 525 JATC. We look forward to reviewing your application!


Your application will not be complete until you have provided a copy of the following requirements:
  • Driver’s license or photo ID
  • Birth certificate
  • High school diploma and transcripts or an approved high school equivalency GED certificate or scores
  • Military transfer or discharge forms (if applicable)


apply for the program

Allegiant Stadium

Allegiant Stadium

we build las vegas, NV

Opened in 2020, Allegiant Stadium is the home field of the NFL’s Las Vegas Raiders. The facility features 65,000 seats, a retractable natural turf field, a translucent roof and walls that open to spectacular views of the Strip. To complete the $1.97 billion project, nearly 1,100 local apprentices were utilized in the completion of this $1.97 billion project, giving them valuable on-the-job learning opportunities.

Brightline West

Brightline West

we build las vegas, nv

Brightline West will be America’s first true high-speed passenger rail system. The modern, eco-friendly system will redefine train travel in America and connect two of our country’s most iconic destinations: Las Vegas and Southern California. Construction is expected to take about four years with service beginning in 2028.

Sphere at The Venetian

Sphere at The Venetian

we build las vegas, nv

One of the most talked-about venues in the world, Sphere at The Venetian is the next generation of Las Vegas entertainment. This revolutionary, fully immersive cinematic, musical and entertainment experience was created by combining centuries-old mathematical formulas with 22nd century engineering and technology.

FONTAINEBLEAU

FONTAINEBLEAU

we build las vegas, nv

At 68 stories, Fontainebleau Las Vegas is the second-tallest structure in Nevada, just under the Stratosphere observation tower. This ultra-luxurious, $3.7 Billion resort stretches across 25 acres of the North Vegas Strip, with 3,780 rooms, a 150,000 square-foot casino, 90,000 square-foot of luxury retail space, a high-tech nightclub and more inside.

RESORTS WORLD

RESORTS WORLD

we build las vegas, nv

When it opened to the public in June 2021, Resorts World became the first completely new casino resort built on the Vegas Strip in more than a decade. The 90-acre, $4.3 Billion Resorts World complex offers some 3,500 luxury hotel rooms by Hilton, Crockfords and Conrad, a 104,000-square-foot casino floor, several cutting-edge entertainment venues and so much more.

TRAINING CENTER

state-of-the-art
facilities

At Local 525, we’re proud to be at the forefront of training excellence — and have been for more than a century. Our state-of-the-art training center, which was rebuilt and opened in 2020.

project image